We have a solution, even in the other side of the world
Did you know that we are responsible for the construction of the main airport in Madagascar’s capital? 8000 Km between Portugal and the construction site, 40 days of transit, 300 tons of structure and 13000m2 of Skinzip® covering. Be sure, we have a solution, even in the other side of the world.